Skip to Main Content

Electrical sites that answer the license question first.

Nobody lets a stranger into the panel without checking. The license number, the insurance, and the work you take belong above the fold rather than on a page called About.

Works alongside
ServiceTitan, Housecall Pro, Jobber and QuickBooks
From first call to live
Two to four weeks
After launch
Hosting, updates and same-day changes

What gets checked before you get called

What the site has to do

  • License and insurance shown where customers look for them
  • Panel, rewire, and generator work each on its own page
  • Emergency calls routed straight to the phone
  • Estimate requests that carry photographs

The pages that win electrical work

  • License and insurance up topThe state license number, the master electrician holding it, and the insurance carrier, sitting where a homeowner or a general contractor goes looking rather than in a footer.
  • A page per scope of workPanel replacement, rewires, standby generators, EV chargers, and troubleshooting, each written with the permit and inspection step named.
  • Estimates that carry photographsThe form takes a picture of the panel and the meter base, which is most of what an estimator needs before a truck moves.

Questions

What does an electrical site have to get right?

A dead circuit, a service upgrade, and a standby generator are bought by three different households, and only one of them is in a hurry.

Half of this is proving you are licensed and insured. The other half is being findable for the one scope of work the visitor came for.

Does it work with the software I already use?

Change orders and invoicing stay in the software the office runs. The site hands a job to Housecall Pro or Jobber with the photographs already attached, so it can be priced from the desk.

Your site works alongside the software you already pay for. Product names and marks belong to their owners, and none of it is a partnership or an official integration.

Why does the town matter for an electrical site?

Standby generator work follows every storm season through these towns, and the search that goes with it is a local one.

What do you need from me to start?

Tell me what your license covers and which work you want more of. Nothing starts until you have a plan and a price in hand, and most sites go live inside a month.

Electrical sites, town by town

Start your electrical site.